2007-Neubau-Bilten-Wiederhergestellt
Referenzfoto3.1-web-e1724229540413

Cabinet systems for the largest hospital in Switzerland

We are delighted to have won the tender for the largest hospital in Switzerland in 2021 and have supplied and installed over 1,300 cabinet systems for the new hospital building.

The cabinet systems were installed in various areas of the hospital. For example, the cabinets in the operating theatre were fitted with glass panes to ensure a hygienic and quick overview of the material. In the patient rooms, installed warming cabinets ensure optimised patient care. And in isolation rooms, specially developed pass-through cabinets ensure safe, contactless material transfer.

Despite pandemic-related challenges, precise time windows for deliveries and a tight installation schedule, the project was completed on time thanks to the excellent organisation and close cooperation with everyone involved. We would like to thank everyone involved and look back positively on the experience gained, which will also be of great benefit for future projects.